While I'm not a big fan of estimating painting projects on a per square foot basis, it's still good to understand the logic behind this system. In this week's video, I share with you the industry standards I was thought early in my career and the reason why I'm not a fan of it.
PRODUCTION RATES:
Normal: 200 sq/ft/hr to cut and roll
Hard: 100 sq/ft/hr to cut and roll
Easy: 400 sq/ft/hr to roll (no cutting)
2nd Coat: 60% of the first coat
RECOMMENDED TRAINING PROGRAM -> ESTIMATING